Location:
AOC in
We invite and encourage the community to contact any of the NRAO/EVLA Advisory committee members, if there are concerns about the EVLA. The committee membership list with accompanying contact information is found at the end of this page.
The charges to the 2004 EVLA Advisory Committee are to evaluate and advise the NRAO Director regarding: (a) the EVLA Phase I project's technical progress and issues; (b) the project's software development plan and resource requirements; (c) the EVLA Phase I management plan, schedule, and cost, including strategies for the effective use of project contingency; (d) the scope and maturity of the project's operations plan, including the resource requirements; (e) the relative priority and scientific impact of options for change in project scope; and (f) the project's future evolution should the opportunity to begin Phase II arise.
Access PowerPoint Template for meeting presentations.
EVLA
Advisory Committee Report
Reading Materials:
2003
EVLA Advisory Committee Report
NRAO
Response to the 2003 EVLA Advisory Committee Report
EVLA
Progress Report (January – June 2004)
[Computing Documents]
EVLA
Real-Time Science Software Requirements
Draft
VLA/EVLA Transition Observing System Dev. & Re-engineering Plan
EVLA
High Level Software Design
EVLA
Engineering Software Requirements
Draft
– EVLA Data Post-Processing Software Requirements
EVLA
Array Operations Software Requirements
EVLA
e2e Science Software Requirements
Presentations:
Introduction and
Charge (F. Lo) |
|
|
Project
Overview (P. Napier) |
||
Project Management
Plan (P. Napier) |
||
VLA/EVLA
Management (J. Ulvestad) |
||
Systems Hardware
Overview (J. Jackson) |
||
Hardware
Performance (R. Perley) |
||
Preparation for
Production (S. Durand) |
||
Correlator (P. Dewdney) |
||
Software
Development Introduction (J. Ulvestad) |
|
|
Development Plan/Org. (G. van Moorsel) |
||
e2e Perspective – (D. Tody) |
||
Scientific Requirements (B. Butler) |
||
Monitor and Control (B. Sahr) Data Flow Chart |
||
Ops and Management - e2e (G. van Moorsel) |
||
Post Processing Introduction (S. Myers) |
|
|
Development Status (J. McMullin) |
||
Algorithm Development (S. Bhatnagar) |
||
Transition and
Operations Plan (F. Owen) |
||
Phase I Descope Options
(P. Napier and R. Perley) |
||
Phase II
Overview (R. Perley) |
EVLA
Advisory Committee
Anthony
Beasley ALMA JAO c/o ESO Alonso de Cordova 3107 Vitacura Casilla 19001 Term ends: Fall 2006 |
Sean Dougherty NRC / HIA NRC Herzberg Inst of Astrophysics CA - Term ends: Fall 2006 |
John Dreher John Dreher Project Scientist, Allen Telescope Array Project Manager, SETI on the ATA http://www.seti.org/science/ata.html 510 642 8397 --------------- 601 Term ends: Fall 2006 |
Marco de Vos Postbus2 Dwingeloo, 7990 AA The Term ends: Fall 2006 |
Gianni Raffi ESO Karl-Schwarzschild-Str. 2 D-85748 Garching bei München Term ends: Fall 2006 |
Mark Reid, Chair Harvard-Smithsonian Center for Astrophysics Radio and Geoastronomy Term ends: Fall 2006 |
Luis Rodriguez Inst de
Astronomia UNAM Apdo Postal 70-264 Term ends: Fall 2006 |
Alan Rogers Haystack Observatory Term ends: Fall 2006 |
Stephen Scott Caltech, OVRO Big Term ends: Fall 2006 |
Tom Soifer CALTECH MS 320 47 Term ends: Fall 2006 |
Steve Thorsett Astrophysics Department Term ends: Fall 2006 |
Jacqueline van Gorkom Dept of Astronomy 538 Term ends: Fall 2006 |
Sander Weinreb JPL MS 168-214 Pasadena, CA 91109 Term ends: Fall 2006 |
|
Last revised on March 08, l2006, by Terry Romero tromero@nrao.edu