| Demultiplexer Design Review
(October 13, 2009) |
| Selection of the OMT Design for
the EVLA X-band Receiver (October 1, 2009) |
| Review of SSS Readiness for
EVLA Shared Risk Observing (June 5, 2009) |
| WIDAR
Correlator Connectivity Review (July 31, 2007) |
| M&C
Transition System Software Critical Design Review (December 5-6,
2006) |
| Front Ends
Critical Design Review (April 24-25, 2006) |
| Feeds Critical
Design Review (February 17, 2005) |
| Monitor & Control
Hardware Critical Design Review (October 20, 2004) |
| Software
Design Review (June 14, 2004) |
| LO/IF/FO
Critical Design Review (May 19-21, 2004) |
| Internal
Fiber Review (October 15, 2003) |
| Overall Data Processing
Architecture Review (July 18-19, 2002) |
| Racks Bins and Modules
Design Review (June 17, 2002) |
| Fiber Installation
Internal Critical Design Review (June 12, 2002) |
| Monitor & Control
System Software Review (May 14-15, 2002) |
| Servo Internal Review
(April 9, 2002) |
| Monitor & Control
System Hardware Review (March 13, 2002) |
| FE System & FeedCone
Review (February 12-13, 2002) |
| LO/IF System Review
(January 22-23, 2002) |
| System & Fiber Optics
Review (December 4-5, 2001) |
| Correlator Conceptual
Design Review (November 2, 2001) |