Fiber Installation CDR

Date:  June 12, 2002       Location:  VLA Site
 
 
 Agenda
 
 
Presentations (ALL NRAO ONLY):
 
Cable Installation (G. Stanzione)
Cable Route Map [JPG]
Cable Locations & Distances
Impact on Future Installations[JPG]
[PPT]
 
 
[PDF]     
Installation Plan, BOM, Cost & Timeline
Cable Route  (T. Baldwin)
  Cable Plan Diagram
  Cable Installation Log
  Splice Locations & Installation
  Cable Lengths
  Reel Plan
  Conduit Fill
  Fiber Lengths
  Cable Splice Log
Lightning Protection BOM & Cost
 
[PPT]
 
 
 
 
 
 
 
 
 
[PPT]
 
 
[PDF]
[PDF]
[PDF]
[PDF]
[PDF]
[PDF]
[PDF]
[PDF]
Antenna Pedestal (T. Baldwin)
Antenna Pad Enclosure Mount
[PPT]
 
[PDF]     
Control Building MDF (S. Durand)
Termination Room Layout
Termination Panel
Fiber Distribution Frame
[PPT]
 
[PDF]
[PDF]
[PDF]
Fiber Cable Lab  (T. Baldwin)
   Production Plan, BOM, Cost, Timeline
[PPT]
               
Summary Costs, BOM and Schedule (S. Durand)
[PPT]
 
 
 
Report
 
 
 
 
 
This page last modified on 10/04/2002 by Terry Romero tromero@nrao.edu