LO/IF System Review
Date: January 22-23, 2002 Location: AOC Auditorium
Reviewers External to the EVLA Project:
Bill Brundage, ALMA Project
Dick Thompson, NRAO/CDL
Rob Long, ALMA Project
Agenda
Presentations: Files are accessible as Power Point and/or PDF files.
Charge to the Panel (Peter Napier) |
PPT |
PDF |
LO/IF System Requirements (Terry Cotter) |
PPT |
PDF |
Preconverter Modules (Paul Harden) |
PPT |
PDF |
Band Switches (Doug Scott) |
PPT |
PDF |
Base Band Converter (Travis Newton) |
PPT |
PDF |
Samplers (Mike Revnell) Module Drawing |
PPT |
PDF PDF |
Transition Converter (Mike Revnell) |
PPT |
PDF |
Direct Digital Synthesizer (Mike Revnell) |
PPT |
PDF |
Central Reference System (Leon Abeyta) |
PPT |
PDF |
First and Second LO System (Jim Muehlberg) |
PPT |
PDF |
Round Trip Phase System (Terry Cotter) |
PPT |
PDF |
PDF Report of the LO / IF Panel
TXT Summary Report
PDF Report / Delta LO/IF
Page revised on 06/19/2002 by Terry Romero tromero@nrao.edu