EVLA M&C Transition System Software

Critical Design Review

December 5 - 6, 2006     Location:  AOC Auditorium
 
 
Reviewers External to the EVLA Project: 
 
   Steve Scott          (chair)      OVRO/ALMA 
   Jeff Kern                             ALMA 
   Mark Clark                         GBT 
   Hanno Holties                     WSRT
 
Agenda 
 
Review Committee Report
   
Reading Materials:
Requirements_Documents
EVLA Monitor and Control Software Design Document
EVLA M&C Software Development Plan:  Task Sheet View      [Author: Bill Sahr, 11/29/2006]
 
 
Presentations:

Welcome & Charge to the Committee     (M. McKinnon)

PPT

PDF

Introduction to EVLA Computing     (B. Butler)

PPT

 

Requirements for the EVLA Monitor    (B. Butler)

and Control Transition System

PPT

 

Organization, Budget, Schedules    (B. Sahr)

PPT

PDF

Overview of the Monitor & Control    (B. Sahr)

Transition System

    DataFlow

    Components

    Carryover

PPT

 

PPT

PPT

PPT

PDF

 

PDF PDF PDF

The Interim Observation Executor    (B. Clark)

PPT

PDF

Obs2script    (B. Butler)

PPT

 

Antenna Monitor & Control: EVLA Antennas    (P. Whiteis)

- the MIB Software (including a demo)

PPT

PDF

Antenna Monitor & Control: VLA Antennas     (H. Ben Frej, K. Ryan)

-          the Control & Monitor Processor (CMP)

      (including a demo)

PPT

PDF

The VLA Correlator:  The New VLA Correlator    (K. Sowinski)

Controller

 

PDF

WIDAR prototypes: Prototype Board Software    (B. Rowen, K. Ryan)

                                                            (K. Ryan presenting for B. Rowen)

PPT

PDF

WIDAR prototypes: The Prototype Correlator    (S. Vrcic)

-Requirements, Prototype VCI

PPT

PDF

WIDAR prototypes: The correlator backend and    (M. Pokorny)

 fast formatter for the prototype boards and the prototype correlator

 

PDF

Interim Data Capture & Format (IDCAF)    (W. Brisken)

PPT

PDF

Interim TelCal and Flagging    (K. Sowinski,)

 

PDF

The Parameters Database    (K. Sowinski)

 

PDF

The Monitor Data Archive, Present & Future    (J. Benson, C. Cai (demo)

PPT

PDF

The Alert Subsystem, Present & Future    (R. Moeser)

PPT

PDF

Operations Software    (B. Butler)

PPT

 

User Interfaces, including demos    (R. Moeser )

PPT

PDF

 

 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page last revised by T. Romero tromero@nrao.edu on 3/29/2007 11:46