Monitor & Control System Software Review

Date:  (May 14-15, 2002)       Location: AOC
 
Reviewers External to the EVLA Project:
Mark Clark                Ralph Marson
Green Bank                ALMA
 
 
 
 



 
 
 
 Agenda
 
DESIGN REVIEW DOCUMENTS
1)  Antenna M&C Subsystem Preliminary Requirements Specification, V2.0 
2)  Operational Interface Software Requirements Specification, V2.0   
3)  EVLA Correlator Backend, Software Requirements Specification, V2.0
4) MIB rtos Candidates
5) MIB Risks / Choices
 
Presentations:
 
Charge to Panel  (P. Napier)
PPT
PDF
EVLA Monitor & Control Software: Status  (W. Sahr)  
PPT
PDF
Recruitment  (G. van Moorsel)
PPT
PDF
Monitor & Control Systems Context  (B. Clark)
 
PDF
MIB Hardware Design: Status  (W. Koski)
PPT
PDF
Test Antenna: Benchtest Requirements & Schedule  (G. Peck)   
PPT
PDF
Antenna MIB: Systems Software & Toolset  (W. Sahr) 
PPT
PDF
Antenna Monitor & Control Subsystem: Preliminary Design  (K. Ryan)
PPT
PDF
Operational Interface: Req. & Design Considerations  (R. Moeser)
PPT
PDF
M&C Network Security  (J. Robnett)
PPT
PDF
Correlator M&C: Requirements, Processors/Boards, Syst. Software (B.Rowan)
Diagrams:  netdiag.ps    mcdiag.ps     bbdiag.ps              
 
PDF
 
Correlator Backend, Overview  (T. Morgan)
PPT
PDF
Correlator Backend, Requirements (T. Morgan)
PPT
PDF
Correlator Backend, Functional Design (T. Morgan)
PPT
PDF
Long-Term Transition Plan  (G. Hunt)
PPT
PDF
E2e Interfaces: Observation Scheduling Software  (B. Waters)   
PPT
PDF
                                                             
                                                                                            
                                              
 
Consolidated Report / Monitor and Control                                                                  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 



 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Page modified on August 05, 2002, by Terry Romero tromero@nrao.edu