Correlator Face to Face Meeting

October 31 - November 01, 2006

Socorro, NM 87801

 

 

AGENDA

 

Decisions and Action Items List

 

Presentations:

PPT

PDF

Introduction and current status of correlator project      (P.Dewdney)   

 

 

Current state of hardware development/delivery              (B. Carlson)

 

PDF

Current state of correlator software development            (S. Vrcic)

PPT

PDF

Prototype board testing: current status, S/W                    (B. Carlson)

   requirements, testing scenarios

 

PDF

Prototype board test S/W: status, unresolved                   (K. Ryan, B. Rowen, M. Pokorny,

   Issues                                                                                      S. Vrcic)

 

PDF

On-the-Sky (OTS) testing of the Prototype correlator:  (B. Carlson, K. Ryan, B. Rowen,

   S/W requirements, major unresolved issues                 M. Pokorny)

 

PDF

Correlator Backend & Fast Formatter: Design, plans,  (M. Pokorny)

   status, schedule

 

PDF

Output data format: status, plans, schedule                      (B. Butler, M. Rupen, A. Richards)

Outputformats-I.ppt

Outputformats-II.ppt

Outputformats-I.pdf

Outputformats-II.pdf

Metadata.pdf

CBE configurations; correlator system network             (B. Carlson)

 

PDF

MCCC correlator configuration mapper                           (S. Vrcic)

PPT

PDF

EVLA M&C system: interaction with correlator,            (B. Sahr)

    status schedule

PPT

PDF

Correlator rack internal mechanical and electrical       (B. Carlson)

   specifications

 

PDF

Correlator Power Monitor and Control System incl.      (B. Carlson)

   S/W requirements

 

PDF

Discussion:  correlator room infrastructure                   (B. Broilo, G. Stanzione, B. Carlson)

 

MEQUIP.pdf

MEQUIPZOOM.pdf

POWTRAY.pdf

MEMO107.pdf

OTS prototype correlator testing workshop; S/W,         (B. Carlson)

   H/W, test suite development.

 

PDF

OTS prototype correlator installation, testing                (B. Carlson)

 

PDF

System installation plan                                                       (B. Carlson)

 

PDF

Production schedule scenarios to speed delivery            (B. Carlson)

 

PDF

           

 

 

 

 

Page created and maintained by Terry Romero  tromero@nrao.edu

Last revised on 3/13/2007