|
||||||||||
PREV NEXT | FRAMES NO FRAMES |
Packages that use edu.nrao.sss.model.project.scheduling.constraint | |
---|---|
edu.nrao.sss.model.project | Project object model. |
edu.nrao.sss.model.project.scheduling | [Put description here.] |
edu.nrao.sss.model.project.scheduling.constraint | [Put description here.] |
Classes in edu.nrao.sss.model.project.scheduling.constraint used by edu.nrao.sss.model.project | |
---|---|
Constraint
Represents an operating condition such as wind, API, and the position of the target and evaluates the probability of a scheduling block meeting its scientific goals under the operating condition. |
Classes in edu.nrao.sss.model.project.scheduling.constraint used by edu.nrao.sss.model.project.scheduling | |
---|---|
Constraint
Represents an operating condition such as wind, API, and the position of the target and evaluates the probability of a scheduling block meeting its scientific goals under the operating condition. |
Classes in edu.nrao.sss.model.project.scheduling.constraint used by edu.nrao.sss.model.project.scheduling.constraint | |
---|---|
Constraint
Represents an operating condition such as wind, API, and the position of the target and evaluates the probability of a scheduling block meeting its scientific goals under the operating condition. |
|
ConstraintApi
Represents an atmospheric phase interference weather constraint. |
|
ConstraintMeasureSum
Computes a weighted average of the operation constraints as the probability that a scheduling block will be successful in realizing its scientific goals. |
|
ConstraintPositionElevation
Represents a minimum elevation of the target constraint. |
|
ConstraintPositionMaximum
Represents the distance in hours from the time the target is at maximum elevation and the current time as a measure of the probability of successful observation of the scheduling block. |
|
ConstraintProbability
Represents the result of analyzing the probability of success of a scheduling block under an operating condition. |
|
ConstraintType
An enumeration of operating conditions that may affect the probability of a scheduling achieving its scientific goals. |
|
ConstraintWind
Represents a wind speed weather constraint on scheduling. |
|
||||||||||
PREV NEXT | FRAMES NO FRAMES |