Package edu.nrao.sss.model.project.scheduling.constraint

[Put description here.]

See:
          Description

Class Summary
Constraint Represents an operating condition such as wind, API, and the position of the target and evaluates the probability of a scheduling block meeting its scientific goals under the operating condition.
ConstraintApi Represents an atmospheric phase interference weather constraint.
ConstraintFactory  
ConstraintMeasureSum Computes a weighted average of the operation constraints as the probability that a scheduling block will be successful in realizing its scientific goals.
ConstraintPositionElevation Represents a minimum elevation of the target constraint.
ConstraintPositionMaximum Represents the distance in hours from the time the target is at maximum elevation and the current time as a measure of the probability of successful observation of the scheduling block.
ConstraintProbability Represents the result of analyzing the probability of success of a scheduling block under an operating condition.
ConstraintWind Represents a wind speed weather constraint on scheduling.
 

Enum Summary
ConstraintType An enumeration of operating conditions that may affect the probability of a scheduling achieving its scientific goals.
 

Package edu.nrao.sss.model.project.scheduling.constraint Description

[Put description here.]



Copyright © 2009. All Rights Reserved.