| Document Title | Document Type | Authur |
|---|---|---|
| Meeting Notes | D. Morgan | |
| Baseline Board Production Sign-off Review Presentation | PowerPoint | B. Carlson |
| Baseline Board V2.1 Prototype Testing Checklist | MS Excel | B. Carlson |
| Baseline Board Production Sign-off Review Followup | PowerPoint | B. Carlson |
| Document Title | Document Type | Authur |
|---|---|---|
| Agenda (Final) | B. Carlson | |
| Purpose & Charge to the Review Committee | S. Dougherty | |
| File set of supporting documents | ZIP of PDF Files | B. Carlson |
| EVLA Correlator System Overview for the CDR | B. Carlson | |
| EVLA Correlator Overview Presentation | PPT | B. Carlson |
| Correlator Sys Infrastrucute Presentation | PPT | B. Carlson |
| Prototype Process Presentation | PPT | B. Carlson |
| Baseline Board Presentation | PPT | B. Carlson |
| Cross-Bar Board Presentation | PPT | B. Carlson |
| DRAO Assy and Test Process Presentation | PPT | B. Carlson |
| Station Board Presentation | PPT | D. Fort |
| Bob Broilo Presentation | PPT | B. Broilo |
| Production Process, Schedule, and Delivery Timelines, Uncertainties Presentation | A. Fink | |
| Issues Discussed in Response to CDR Recommendations re: Station Board Issues | Z. Ljusic |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA VCI Review Agenda | M. Rupen | |
| Virtual Correlator Interface (VCI) - An Overview | S. Vrcic | |
| A25201N0000 - EVLA Correlator Monitor & Control Virtual Correlator Interface (VCI) [PS] V3.3 | S. Vrcic | |
| EVLA WIDAR VCI Review Prestentation | M. Rupen |
| Document Title | Document Type | Authur |
|---|---|---|
| Agenda | - | |
| Correlator Specifications | M. Rupen | |
| Overview of New Connectivity Scheme for the EVLA Correlator | B. Carlson | |
| Technical Benefits and Difficulties | B. Carlson | |
| Scientific Impact | M. Rupen | |
| EVLA Correlator New Connectivity Scheme Software Impact | S. Vrcic | |
| New Connectivity Scheme Budget & Schedule Impacts | P. Dewdney | |
| Additional Reading: EVLA Project Book: Chapter 8 | Carlson, Fort, Pokorny, Rowen | |
| Additional Reading: NRC-EVLA Memo. No. 028 An Optimized Connectivity Scheme for the EVLA Correlator | P. Dewdney |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA Correlator Chip Production Sign-off Critical Design Review Presentation | B. Carlson | |
| EVLA Correlator Chip Production Sign-off Critical Design Review Presentation | PPT | B. Carlson |
| Document Title | Document Type | Authur |
|---|---|---|
| WIDAR Correlator Face-to-Face Meeting Agenda | - | |
| Overall Architecture | PPT | B. Butler |
| Correlator Software Overview | S. Vrcic | |
| Virtual Correlator Interface (VCI) Overview | S. Vrcic | |
| Output Data Products & Formats | - | B. Butler, S. Vrcic, J. McMullin |
| WIDAR Prototype Testing User Interface Software | K. Ryan | |
| Correlator GUI | S. Vrcic | |
| WIDAR Real-Time Data Display | D. DelRizzo | |
| Baseline Board to CBE Connection | - | J. Robnett, B. Rowen |
| EVLA Correlator Prototype and OTS Testing | B. Carlson | |
| Software Overview | S. Vrcic | |
| Alerts, Flags & Logs | - | B. Butler |
| Programmer's Guide to the EVLA Correlator | B. Carlson | |
| Station Board Real-Time Software | - | B. Rowen |
| Station Board Testing | D. Fort | |
| Data Product Meeting , Wednesday, 4/5/2006, Socorro, NM | - | |
| Meeting Notes, Correlator Face-to-Face Meeting, April 34rd & 4th, Socorro, New Mexico | - |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA Correlator Long-term Schedule Review Meeting Notes & Action Items | Minutes - PDF | D. Morgan |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA Software Review Meeting Agenda | Agenda - PDF | S. Vrcic |
| EVLA Software Review Meeting Minutes | Minutes - PDF | S. Vrcic |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA Correlator Jun/04 Meeting Introduction | PowerPoint - PDF | P. Dewdney |
| System Overview | PowerPoint - PDF | B. Carlson |
| Station Board Components | PowerPoint - PDF | D. Fort / Z. Ljusic |
| Baseline-Based Components: FPGAs & Corr. Chip | PowerPoint - PDF | B. Carlson |
| Transmission Line Topologies-Baseline Board | PowerPoint - PDF | Z. Heng |
| EVLA Monitor & Control Software | PowerPoint - PDF | S. Vrcic |
| CMIB Hardware Communications | PowerPoint - PDF | B. Rowen |
| Correlator Backend System | PowerPoint - PDF | T. Morgan |
| Power, Grounding, Cabling | PowerPoint - PDF | B. Carlson |
| Cooling/Airflow Plans | PowerPoint - PDF | B. Carlson |
| Correlator Room Requirements | PowerPoint - PDF | R. Long / J. Jackson |
| e-MERLIN Status Report | PowerPoint - PDF | S. Garrington |
| Correlator EMI Requirements | PowerPoint - PDF | R. Long / J. Jackson |
| On-The-Sky Testing | PowerPoint - PDF | D. Fort |
| Installation and Test | PowerPoint - PDF | B. Carlson |
| Correlator Installation Plans | PowerPoint - PDF | R. Long / J. Jackson |
| Final Meeting Notes | PowerPoint - PDF | A. Fink |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA Project Management Presentation | PowerPoint - PDF | A. Fink |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA Correlator Software Meeting Introduction | PowerPoint - PDF | P. Dewdney |
| Correlator Backend System RFS Review | PowerPoint - PDF | T. Morgan |
| CMIB Software | PowerPoint - PDF | B. Rowen |
| e-MERLIN Software | PowerPoint - PDF | R. Noble |
| FIR Filter Update | PowerPoint - PDF | D. Fort |
| Final Meeting Notes | Notes - PDF | A. Fink |
| Document Title | Document Type | Authur |
|---|---|---|
| EVLA Correlator Conceptual Design Review Agenda | Agenda - PDF | - |
| Project overview and current status | PowerPoint - PDF | P. Dewdney |
| Overall EVLA schedule | PowerPoint - PDF | P. Napier |
| Science Drivers for the EVLA Correlator | PowerPoint - PDF | R. Perley |
| Requirements and additional capabilities | PowerPoint - PDF | B. Carlson |
| Architecture walk-through | PowerPoint - PDF | B. Carlson |
| Project Plan | PowerPoint - PDF | B. Carlson |
| Detailed Technical Points | PowerPoint - PDF | B. Carlson |
| Addendum | PowerPoint - PDF | B. Carlson |
| EVLA Correlator CoDR Panel Report | PowerPoint - PDF | Panel |