VERY LONG BASELINE ARRAY OBSERVING LOG -------------------------------------- Project: TW005A2 Observer: Claussen, M. Project type: TEST Obs filename: tw005a2.vex Date/Day: 2021MAY19/139 Ants Scheduled: SC HN NL FD LA PT KP OV BR MK =UT-Time===Comment===============================================MF#===%AD==AMD= Operator: Jessica King 1325 Begin. 1325-1345 *LA pulled to avoid idler wheel damage. WO-9892 AMECH 100 20 1325-1345 *HN rotation silently failed and was stuck in FE 50 10 the 7mm position. WO-10157 1325-1345 *PT 7mm warm. CRYO 100 20 1345 End. Downtime Summary: Total downtime : 50 min Percentage downtime of observing: 25.0% Average downtime per hour : 15.0 min Total scheduled observing time (# Antennas): 200 min (10) Notes: * = Entries where data was affected. % = Entries where data may have been affected. & = Entries where the site tech was called out. WEA = Weather entries. MF# = Maintenance form or major downtime category associated with a problem. %AD = The percentage of an antenna affected by a problem. AMD = Total antenna-minutes downtime for a problem. Tsys = System Temperature (TP/SP x Tcal/2) ACU = Antenna Control Unit FRM = Focus/Rotation Mount RFI = Radio Frequency Interference VME = Site control computer CB = Circuit Breaker vclock = Program that compares site clock time to a standard.