Oct 18, 2004

L301 Status



#1
Functioning Normally. (Breadboard-in-a-box version) Scheduled for update ~November 1-5. (3) A13
#2
Functioning Normally. (Hybrid version 1/2 Production / 1/2 Discrete RF section) A13
#3
Functioning normally ex. won't lock at 19072 and 19328 MHz. (Hybrid version 1/2 Production / 1/2 Discrete RF section) ATR
#4
Under construction.(Hybrid version 1/2 Production / 1/2 Discrete RF section) LO
#5
Production  version  depends on  Delivery of AGC subassy from Miteq.  Planned for Jan 1, 2005 NA
#6
Production  version  depends on  Delivery of AGC subassy from Miteq.  Planned for Jan 1, 2005
NA
#0
Construction planned for Ready Service Spare as parts become available, possibly use breadboard components. No Due Date Planned.  Use in test rack. NA


L302 Status



#1
Functioning Normally. Main DDS sample output added for phase testing. (Breadboard-in-a-box version) Scheduled for update ~November 1-5 (3) A13
#2
Repairing.   Scheduled for update ~November 1-5 (3) LO
#3
Digital Testing Only.  RF Section disabled. (Hybrid version 1/2 Production / 1/2 Discrete RF section) LO
#4
Functioning Normally. (Hybrid version 1/2 Production / 1/2 Discrete RF section) High Phase Noise & Spurs present in test rack. ATR
#5
Functioning Normally. (Hybrid version 1/2 Production / 1/2 Discrete RF section) (no comb filter) (note 2)
LO
#6
Functioning Normally. (Hybrid version 1/2 Production / 1/2 Discrete RF section) (no comb filter) (note 2) LO
#7
Production  version  depends on  Delivery of AGC subassy from Miteq.  Planned for Jan 1, 2005 NA
#8
Production  version  depends on  Delivery of AGC subassy from Miteq.  Planned for Jan 1, 2005 NA
#9
Production  version  depends on  Delivery of AGC subassy from Miteq.  Planned for Jan 1, 2005 NA
#10
Production  version  depends on  Delivery of AGC subassy from Miteq.  Planned for Jan 1, 2005 NA
#0
Construction planned for Ready Service Spare as parts become available, possibly use breadboard components. No Due Date Planned.  Use in test rack. NA

Legend:

Done, Pending, Late or repairing, Axx= Antenna xx, ATR= Antenna Test Rack, LO= Synth Lab, NA= Not built.

Notes:

1.  All synthesizers are limited to 2 telnet sessions until MIB stack problems are resolved.  Unlimited monitoring possible w/Moeser software.
2.  Synths without comb filter may not function optimally.  Check with Synth lab for details.
3.  These modules will be updated to the new form factor as time and schedule permit.  Will remain discrete RF sections.