Use Case: ProcessWVRCalibration

The Calibration Pipeline reduces Water Vapor Radiometer (WVR) measurements in quasi-real time, in an automatic way. The system is halted until the results are available.

Role(s)/Actor(s):
Primary: Calibration Pipeline
Secondary:

Priority: Desirable

Performance: Seconds

Frequency: Hours

Preconditions:

  1. The processing is initiated by the Calibration Pipeline (see Use Case  ProcessCalibrations).
  2. One WVR calibration scan has been obtainted, consisting in one or several observations (sky, hot load?).
  3. Input:
Basic Course:
  1. Check data consistency.
    Exception course: If data not consistent: stop processing and return a specific error code.
  2. Compute the conversion factors.

  3. Exception course: If failure: stop processing and return a specific error code.
  4. Verify that result is sensible and set quality code.

  5. Exception course: If failure: stop processing and return a specific error code.


Alternate Course:

Postconditions:

    1. Outputs:
    2. Results are fed back to the Calibration Pipeline.


Issues to be Determined or Resolved:

    1. The WVR design and calibration scheme are not finalized. Input from the WVR developers is expected as hardware development and tests progresses.


Notes:

Owner: Frederic Gueth