Use
Case: Executive, Executive Package: Exec_SelectSB
The Operator can switch the scheduling system for SchedBlocks
between dynamic and manual modes. One task of the Operator is to
verify and possibly change the sequence of SchedBlocks proposed by
the scheduling system. This Use Case illustrates this task.
Goal: Manipulate scheduling blocks
Contact Author: P. Grosbol
Role(s)/Actor(s):
Primary:
Secondary:
Priority:
Critical
Performance:
On the order of seconds
Frequency of Use:
A few times per hour
Preconditions:
- The ALMA software system is running.
- Operator GUI is available.
- Scheduling is running and SB's are available in the database
Basic
Course:
- When the Scheduler is in dynamic scheduling mode it will present
a ranked list of possible SB's to the Operator.
- The Operator will select one of the SB's listed.
- The SB's is sent to the Scheduler which will start it as the
next SB's to be observed.
- Alternative Course:
- If the Operator does not respond before the timeout the highest
ranked SB will be selected.
- If no SB's are available for execution a warning will be
issued.
Postconditions:
- The selected SB is being executed
Issues
to be Determined or Resolved:
- none at this time
Last modified: 31oct03