next up previous contents
Next: AUTOTAPE Up: Details of SCHED Parameters Previous: ADDRESS1, ADDRESS2, ADDRESS3 and   Contents


AUTOPEAK

AUTOPEAK, without an argument, is used to request automatic insertion of reference pointing scans based in information in the PEAKFILE (which can also be specified in the schedule input file using PEAKINIT). See the section on reference pointing for much more information. Note that specifying AUTOPEAK will cause SCHED to try to insert pointing scans, but does not guarantee that it will find scans at high enough frequency or with enough of a gap from the previous scan.



Craig Walker 2009-02-24