Next:
Using SCHED for Project
Up:
THE SCHED USER MANUAL
Previous:
Keyin Input for Plotting
Contents
INFORMATION AND ADVICE ON SPECIFIC TOPICS
Subsections
Using SCHED for Project Planning
Scheduling Tips
Observing Strategy
Scan Times
Dynamic Scheduling
Tape Management
Recording Systems.
Recording Systems History and Background
MARK5 and EVLBI
VLBA
MARK IV
NON-VLBA Telescopes with VLBA Recorders
S2
Wide Band VLBA and Mark IV Modes
Spectral Line Observations
Reference Pointing
Scheduling the VLA
VLBI at the VLA
VLA-Only Project Example
Parameters Specific to the VLA
VLA Standard Bands.
Special Concerns for Specific Observatories
Green Bank.
Single Dish VLBA Observing
Configuration Studies
Satellite Tracking
Craig Walker 2006-06-08