next up previous contents
Next: PCAL Up: Details of Setup File Previous: NOISEFRQ   Contents


PERIOD

PERIOD gives the integration time for detected powers in the base band converters (BBCs). One value is accepted here although SCHED will write that value out separately for each baseband channel. It would be ideal to set this to 30 seconds or so, but this time is also used for the auto-leveling time constant so it should be significantly less, with values of 1 or 2 typical. A value of 0 implies do not integrate beyond the 1/80 sec cal cycle time.



Craig Walker 2014-04-14