Project Status Throughout the Collaboration
APS 300,000 170 IOC 20 ws reliable operation*
HERA Cryo 6,000 4 IOCs 1 ws reliable operation
Tesla Test Inj 600 4 IOCs 2 ws reliable operation
KeckII 1,500 2 IOCs 2 ws reliable operation
PSR 2,500 4 IOCs 6 ws reliable operation
Duke FEL 2,500 6 IOCs 3 ws reliable operation
PEP II RF 8,400 8 IOCs 2 ws reliable operation
BESSY 15,000 15 IOCs 4 ws reliable operation
1APS Beamline 15,000 22 IOCs 10 ws reliable operation
Jlab 180,000 81 IOCs 30 ws Mostly reliable*
* Jlab has software problems under 1% of downtime - mostly at restart. Hardware problems are still over budget (2%) with power supplies and Bira Crate Controllers.
*APS has one IOC loss every 2 weeks - tracking down. Under 1% down time.